Usability and accessibility links

24 Infrastructure, property, plant, equipment and vehicles

 

2011

2011

2011

2011

2010

2010

2010

2010

 

Cost

$000

At Fair Value

$000

Accumulated depreciation

$000

Carrying amount as at 30 June 2011

$000

Cost

$000

At Fair Value

$000

Accumulated depreciation

$000

Carrying amount as at 30 June 2010

$000

Owned Assets:
               

Land (i)

0

350,737

0

350,737

0

342,771

0

342,771

Buildings (ii)

0

207,288

93,796

113,492

0

204,873

89,241

115,632

Freight network infrastructure (iii)

0

5,084,696

3,793,700

1,290,996

0

5,084,088

3,710,930

1,373,158

Rollingstock (ii)

0

1,023,824

369,867

653,957

0

980,844

337,588

643,256

Railway infrastructure (iv)

0

2,993,133

861,213

2,131,920

0

2,901,948

776,451

2,125,497

Plant, equipment and motor vehicles

38,584

0

14,430

24,154

36,414

0

9,960

26,454

Bus infrastructure (ii)

0

232,081

101,502

130,579

0

225,285

95,561

129,724

Vessels (ii)

0

3,200

1,771

1,429

0

3,200

1,691

1,509

Buses (ii)

0

664,240

345,784

318,456

0

641,986

340,019

301,967

Construction in progress (v)

121,368

0

0

121,368

68,134

0

0

68,134

TOTAL

159,952

10,559,199

5,582,063

5,137,088

104,548

10,384,995

5,361,441

5,128,102

  1. Land controlled by the PTA has been revalued as at 1 July 2010 by Landgate (Valuation Services) and Burgess Rawson. The valuations were performed during the year ended 30 June 2011 and recognised at 30 June 2011. The fair value was determined by reference to market values. See note 2(g).

    To ensure the valuations provided by Valuation Services were compliant at 30 June 2011 with the fair value requirements under AASB 116, Valuation Services provided the Department of Finance with information that tracked the general movement in the market value of land and in building construction costs from the 1 July 2010 (the date of valuation) to 30 June 2011. DTF reviewed the information and determined that the valuations provided by Valuation Services (as at 1 July 2010) were compliant with fair value requirements for 30 June 2011 reporting without further adjustment by reference to market values based on existing use.

    Land and buildings which are commercially leased were independently valued on the capitalised value of current lease by Burgess Rawson. The valuations were performed during the year ended 30 June 2011 and recognised at 30 June 2011.

  2. Buildings, rollingstock, bus infrastructure, vessels and buses were last revalued on 30 June 2010 by independent valuers, engineering and management professionals at depreciated replacement cost.
  3. Freight network infrastructure was revalued on 30 June 2010 at depreciated replacement cost. A model has been developed using independent third party audited information, engineering and independent valuers. The PTA has changed its valuation methodology from market value to depreciated replacement cost. As a reliable market value does not exist for the freight network infrastructure the effect and disclosure on the current and future periods cannot be determined.
  4. Railway infrastructure was last revalued on 30 June 2008. Railway infrastructure has been revalued by PTA’s management professionals and third party vendors. The methodology adopted has been depreciated replacement cost with a modern equivalent asset capable of delivering the same service potential.
  5. Construction in progress is valued at cost.

Reconciliations of the carrying amounts of infrastructure, property, plant, equipment and vehicles at the beginning and end of the current financial year are set out below.

2011

Carrying amount at the start of the year

$000

Additions

$000

Transfers

$000

Revaluation Increments

$000

Disposals

$000

Depreciation

$000

Carrying amount at the end of the year

$000

Owned Assets:
             

Land

342,771

0

3,034

4,932

0

0

350,737

Buildings

115,632

323

2,092

0

0

(4,555)

113,492

Freight network infrastructure

1,373,158

0

609

0

0

(82,771)

1,290,996

Rollingstock

643,256

0

42,979

0

0

(32,278)

653,957

Railway infrastructure

2,125,497

755

90,438

0

0

(84,770)

2,131,920

Plant, equipment and motor vehicles

26,454

2,045

205

0

(1)

(4,549)

24,154

Bus infrastructure

129,724

146

6,658

0

(2)

(5,947)

130,579

Vessels

1,509

0

0

0

0

(80)

1,429

Buses

301,967

0

43,538

0

(671)

(26,378)

318,456

Construction in progress

68,134

191,456

(138,222)

0

0

0

121,368

TOTAL

5,128,102

194,725

51,331

4,932

(674)

(241,328)

5,137,088

2010

Carrying amount at the start of the year

$000

Additions

$000

Transfers

$000

Revaluation Increments

$000

Disposals

$000

Depreciation

$000

Carrying amount at the end of the year

$000

Owned Assets:
             

Land

338,785

0

(12,591)

16,577

0

0

342,771

Buildings

60,710

0

59,282

261

0

(4,621)

115,632

Freight network infrastructure

266,096

0

17,052

1,096,677

0

(6,667)

1,373,158

Rollingstock

578,452

0

83,971

9,880

0

(29,047)

643,256

Railway infrastructure

2,216,671

648

(7,319)

0

(5)

(84,498)

2,125,497

Plant, equipment and motor vehicles

22,149

293

7,943

0

(2)

(3,929)

26,454

Bus infrastructure

105,245

315

24,039

5,734

(14)

(5,595)

129,724

Vessels

1,244

0

83

247

0

(65)

1,509

Buses

260,359

0

63,341

2,280

(660)

(23,353)

301,967

Construction in progress

158,082

168,093

(258,041)

0

0

0

68,134

TOTAL

4,007,793

169,349

(22,240)

1,131,656

(681)

(157,775)

5,128,102