Audited Key Performance Indicators
For the year ended 30 June 2005

Transperth Bus Operations

Transperth bus operations succeeded in minimising the impact of construction works associated with the Southern Suburbs Railway on bus punctuality through improved traffic management schemes and timetable adjustments. As a result of these measures the actual result for 2004/05 was better than the target.

Transperth Ferry Operations

 

Transperth ferry operations has maintained its consistent high level of performance.

 

Country passenger rail and road coach services

 

Transwa Rail

 

Prospector services

 

 

During commissioning of the new Prospector railcars, reliability problems were experienced. There was also a significant increase in freight traffic which requires more train crossings, thus increasing travel time.

Australind

The target for 2004/05 could not be achieved due to severe speed restriction following the track upgrade work from Pinjarra to Mundijong.

AvonLink

The data for 2004/05 includes the newly introduced Merredin service where on-time running has been affected by freight train traffic.

     
 