There is an emerging trend of zero serious
occurrences (Category A) which is encouraging given
the high level of disturbance to the operating railway.
The estimates were based on historical data and these
will be reviewed further in the next financial year.
The actuals for 2004/05 are below the upper control
limit and PTA will continue to monitor and control the
rate of occurrences.
|
Regional school bus services
Accidents attributable to all causes are notified to and
recorded by the School Bus Team Leader Vehicle
Inspector.
The performance measure for the notifiable
occurrences is expressed as the number of notifiable
occurrences (accidents) reported during the school
year. A low level of incidents indicates that sound
safety procedures and controls exist and are being
adhered to throughout the regional school bus fleet.
A total of one major and eleven minor accidents
occurred in 2004/05. Although this is disappointing
compared to the target level there were no physical
injuries or fatalities involving school students.
Outcome 2: Protection of the
long term functionality of the rail
corridor and railway infrastructure
The most significant issue for this outcome is the
management of the long term lease of the rail freight
infrastructure to Westnet Rail Pty Ltd.
Under the terms and conditions of the railway
infrastructure lease, an independent inspection of the
railway infrastructure is carried out every five years.
The first independent inspection was completed in
June 2005.
The results of this inspection did not indicate any cause
for concern and that the rail corridor and
infrastructure is being satisfactorily maintained. |